|
|
Projekt
Managment |
|
Home
|
Aluminum die Casting,
Zinc die Casting,
Magnesium die Casting,
Plastic Injection,
Steel- Grey- Investment Casting,
Stamping parts,
Tools Moulds and Jigs,
CAD Design & Grafic,
Consulting & Project Management,
Surface Treatment,
Automotive Parts
,
Extrusion Profiles,
Mould accessories,
Carbide accessories
|
|
-
What
means the pictograph, your pushed to open this page, a clock
behind an chair ?
-
It
is the TIME chasing all project managers !
|
|
CAO Mould F0208/00 |
|
|

|
Gant
- diagram, time schedule
For
every larger project we prepare generally exact time schedules with
necessary
mile stones in it.
A
continuous check of the mile stones, to react quickly, if necessary is
standard.
That
we work also in this field computer supported is a standard for a
company like CAO.
|
|
-
Weak-points
analysis (Fish boon -- diagram)
-
-
We
make, if necessary, a weak-points analysis, for parts and also for
complete projects.
-
Such
a analysis we using together with our customer to find out better
solutions before
-
starting
moulds, tool or manufacturing, which leads us to save time and cost.
.
-
Project
(ready for sales)
-
-
To
get a product sales ready, you need more than design, parts and
assembling,
-
you need also suitable
packing, operation manual, simply every things which
-
enables our
customer "only" to sell.
-
From
CAO you can get all, you can get products ready for selling
-
Our
example shall show this.
Digital air pressure tester, 6 bar, two-digit display tolerance
This equipment was led by CAO as a project, this means, developed ,
together with one engineering office in Kaoshiung and in Tainan manufactured.
|
|